A flat increase across every location overfunds some sites and starves others. Here’s how to build next year’s budget one location at a time, from what each site actually spent.

Quick answer

A location-level budget is a separate plan for each site’s labor, maintenance, capital and operating costs in the coming year. It is built bottom-up: it starts from that location’s own actual spending, adjusts for known changes such as wage increases and aging equipment, and then rolls up into the company budget. It is checked against actual spending every month.

Most multi-location budgets start the same way. Someone opens last year’s file in early December, adds a column for next year, and fills it with last year’s number plus a few percent. It’s quick, and every location gets the same treatment.

Your locations had different years, though. One has an HVAC unit on its last season. Another ran over its labor plan all summer. A single percentage spreads the money evenly across problems that aren’t spread evenly.

Here’s a six-step way to build next year’s budget one location at a time, and the monthly habit that keeps it useful after January.


Why one percentage doesn’t fit every location

Two locations under the same brand can face very different years. Wage rates and minimum-wage changes vary by city and state, equipment wears out faster at busier sites, and traffic, hours and lease terms all differ.

Minimum wage alone shows the gap. On January 1, 2027, Michigan’s minimum wage rises from $13.73 to $15.00 an hour, an increase of about 9%. Nebraska’s rises from $15.00 to $15.26, under 2%. Indiana and Texas stay at the federal $7.25. A brand with locations in all four states faces four different labor cost changes on the same day, before any raises above the minimum.

Finance teams call the flat-percentage approach top-down budgeting: headquarters sets one number and spreads it across locations. Building each location’s budget from its own actuals and then adding the locations up is bottom-up budgeting, and it’s the method the rest of this guide walks through.


How to build a bottom-up budget in six steps

Work through these steps for each location, in this order.


Step 1. Close the year with what each location actually spent

Start with actuals, by location, before anyone writes a number for next year. At a minimum, pull:

  • Labor hours and labor dollars by position

  • Overtime and premium pay

  • Maintenance spend, split into preventive and reactive

  • Repair costs for any equipment that broke more than once

  • Capital projects finished this year, and what they cost

These usually live in a few places, such as payroll and time clock exports, work order invoices and accounts payable. What matters is that every number is tied to a location.

Then mark the one-offs. A burst pipe, a remodel, a general manager vacancy that ran for three months. Note each one so it stays out of next year’s starting point.


Step 2. Build labor in hours first, then dollars

Labor is usually the cost a location manager controls most directly, so build it in hours first. Look at each location’s traffic by day and hour, its operating hours and the positions it needs covered, then set planned hours by position and day. Hours are what a manager works with when building a schedule, so the budget should use the same terms.

Then price the hours. Start with current pay rates by position, and layer in what changes in the new year:

  • Raises. For a national reference point, private-industry wages and salaries rose 3.1% over the 12 months ending September 2026, and benefit costs rose 3.9%, according to the Bureau of Labor Statistics Employment Cost Index. Your markets may run higher or lower.

  • Minimum-wage and scheduling-law changes in each location’s city and state, many of which take effect January 1.

  • Overtime, holiday premiums, shift differentials and predictability pay, based on what each location actually paid this year.

A location that ran well over its labor plan this year needs a closer look before it gets a bigger budget. Sometimes the plan was wrong. Sometimes the schedules were.


Step 3. Budget maintenance from the work orders

Maintenance spend comes in two kinds. Preventive maintenance is planned: filter changes, quarterly service visits, inspections. Reactive maintenance is everything that breaks without warning. Budget them as separate lines.

Preventive is predictable. Take this year’s schedule, adjust for equipment added or retired, and price it. A facility maintenance checklist is a good starting list for any location without one.

Reactive is where budgets get surprised. Use each location’s own reactive spend from this year as its baseline. A site with older equipment or heavier use will keep running higher, and its budget should say so up front.

While you’re in the work orders, look for repeat offenders, the units that generated four or five work orders this year. Each one either goes in next year’s repair line or moves to Step 4 as a replacement. If the backlog itself is the problem, here’s how to clear a maintenance backlog without burning out your team.


Step 4. Decide repair or replace before you set the capital line

Capital requests tend to arrive as a wish list, and the location that pushes hardest often gets the most. One rule makes the line fairer.

For each location, list the equipment that’s near or past its expected life, with what it’s worth today and what it cost to keep running this year. Then pick one repair-or-replace threshold and use it everywhere. For example, when a repair would cost half or more of what the asset is currently worth, price the replacement instead. The exact percentage matters less than applying the same one at every location.

Add open corrective actions that need money, too. When an audit turns up a problem that needs funding, like a failing walk-in cooler or a worn-out floor, give it an estimated cost. Mark it capital or operating so it gets a yes or a no in the budget instead of sitting open. Woven’s corrective action plan template has a field for that.


Step 5. Review each budget with the location’s manager

Last year’s numbers can’t see what’s coming. The general manager can: a competitor opening down the street, a lease renewal in June, a shift lead who plans to leave in March.

Give each manager 30 minutes with their location’s draft on screen, and ask:

  1. What’s changing at your location next year?

  2. What broke, or nearly broke, this year?

  3. What do you need that isn’t in here?

The review also builds ownership: a manager who helped set the number is more likely to run the location to it. Franchise Business Review’s 2026 Franchising at Work report, a survey of more than 9,500 franchise employees, found managers were the strongest part of the employee experience. That makes the GM the right person to carry the budget to the team.


Step 6. Turn the annual number into weekly and monthly targets

A budget that only gets opened again next December won’t change much in between. Break each location’s annual numbers into targets people can act on:

  • Labor becomes a weekly plan of hours and dollars that schedules are built against.

  • Maintenance gets a monthly spend review by location, with preventive and reactive side by side.

  • Capital becomes a dated list of what’s being replaced, when, and who owns it.

Then review variance every month, location by location. A location that runs over in March shows up in April, with nine months left to recover. Setting each location’s goals for the new year comes next.


How Woven helps you build the budget and stay on it

For locations that run on Woven, many of the numbers in this guide are already there.

This year’s actuals, by location. Report Center breaks this year’s numbers down by location, including Overtime by Location, Scheduled vs. Actual hours, time clock exports, Invoice Summary by Location, and work order reports by location, category and asset. Each location’s work order insights show maintenance spend by type and the preventive versus reactive mix, which is the split Step 3 needs.

Next year’s costs, before they arrive. Some of next year’s spending is already visible. Upcoming preventive maintenance comes straight from each location’s PM schedules and can be exported, and Average Invoice Cost by Vendor helps price it. The asset matrix shows each unit’s estimated end-of-life date and how much of its expected life is used, so the replacements coming due next year show up location by location. Warranties that recently lapsed or expire within 90 days are flagged, along with the repeat offenders. Corrective action plans from location audits carry an estimated cost, marked capital or operating, so findings that need money are already listed when you build the capital line.

Staying on plan once the year starts. Labor plans hold planned hours and, since November, planned dollars for each location, by day, position or department. As a manager builds the schedule, Woven shows scheduled hours and dollars against the plan, with the gap and the percent of plan. Dollars show only for people allowed to see pay. If a week goes over plan, Woven can ask the manager to confirm before publishing, or stop the publish unless someone with permission overrides it. Scheduled vs. Labor Plan reports cover the monthly review from Step 6.


Start next year with a budget every location can run to

Many budgets this December will start from last year’s file and a percentage. Building one location at a time takes longer the first year. In return, every number has a reason behind it, and every location has a manager who knows the plan because they helped write it.

If rebuilding every location at once is too much, start with the two or three that surprised you most this year. That’s usually where a flat percentage was furthest off.

One more line is worth a place in next year’s plan: getting these numbers out of separate systems and into one.

Deciding what makes next year’s budget? See whether Woven belongs in it. Book a demo and we’ll walk through this year’s numbers and next year’s plan with your locations.


Frequently asked questions

What is a location-level budget?

A location-level budget is a separate budget for each location’s labor, maintenance, capital and operating costs, built from that location’s own actual spending and then rolled up into the company budget.

What should each location’s budget include?

Labor by position, overtime and premium pay, preventive and reactive maintenance, capital replacements, corrective actions that need funding, and other operating costs such as utilities, supplies and service contracts.

What’s the difference between top-down and bottom-up budgeting?

Top-down budgeting starts with a company-wide number, often last year’s total plus a percentage, and divides it among locations. Bottom-up budgeting starts at each location, builds its budget from its own actual costs and known changes, and adds the locations up to get the company total. For a multi-location business, bottom-up budgeting picks up differences in wages, equipment age and traffic that a single percentage misses.

How do you build a budget for multiple locations?

Build each location’s budget first, from its own actual spending, then add them up. Remove one-time costs, plan labor in hours before dollars, set maintenance from work order history, and review each draft with the location’s manager.

How much should we plan for wage increases next year?

Start from each location’s current pay rates and local minimum-wage changes. Nationally, private-industry wages and salaries rose 3.1% in the 12 months ending September 2026 (BLS Employment Cost Index), but markets and roles vary, so set the figure by location.

How often should location budgets be reviewed?

Monthly, by location. Labor is worth checking weekly against the schedule, while a manager can still change it.

A flat increase across every location overfunds some sites and starves others. Here’s how to build next year’s budget one location at a time, from what each site actually spent.

Quick answer

A location-level budget is a separate plan for each site’s labor, maintenance, capital and operating costs in the coming year. It is built bottom-up: it starts from that location’s own actual spending, adjusts for known changes such as wage increases and aging equipment, and then rolls up into the company budget. It is checked against actual spending every month.

Most multi-location budgets start the same way. Someone opens last year’s file in early December, adds a column for next year, and fills it with last year’s number plus a few percent. It’s quick, and every location gets the same treatment.

Your locations had different years, though. One has an HVAC unit on its last season. Another ran over its labor plan all summer. A single percentage spreads the money evenly across problems that aren’t spread evenly.

Here’s a six-step way to build next year’s budget one location at a time, and the monthly habit that keeps it useful after January.


Why one percentage doesn’t fit every location

Two locations under the same brand can face very different years. Wage rates and minimum-wage changes vary by city and state, equipment wears out faster at busier sites, and traffic, hours and lease terms all differ.

Minimum wage alone shows the gap. On January 1, 2027, Michigan’s minimum wage rises from $13.73 to $15.00 an hour, an increase of about 9%. Nebraska’s rises from $15.00 to $15.26, under 2%. Indiana and Texas stay at the federal $7.25. A brand with locations in all four states faces four different labor cost changes on the same day, before any raises above the minimum.

Finance teams call the flat-percentage approach top-down budgeting: headquarters sets one number and spreads it across locations. Building each location’s budget from its own actuals and then adding the locations up is bottom-up budgeting, and it’s the method the rest of this guide walks through.


How to build a bottom-up budget in six steps

Work through these steps for each location, in this order.


Step 1. Close the year with what each location actually spent

Start with actuals, by location, before anyone writes a number for next year. At a minimum, pull:

  • Labor hours and labor dollars by position

  • Overtime and premium pay

  • Maintenance spend, split into preventive and reactive

  • Repair costs for any equipment that broke more than once

  • Capital projects finished this year, and what they cost

These usually live in a few places, such as payroll and time clock exports, work order invoices and accounts payable. What matters is that every number is tied to a location.

Then mark the one-offs. A burst pipe, a remodel, a general manager vacancy that ran for three months. Note each one so it stays out of next year’s starting point.


Step 2. Build labor in hours first, then dollars

Labor is usually the cost a location manager controls most directly, so build it in hours first. Look at each location’s traffic by day and hour, its operating hours and the positions it needs covered, then set planned hours by position and day. Hours are what a manager works with when building a schedule, so the budget should use the same terms.

Then price the hours. Start with current pay rates by position, and layer in what changes in the new year:

  • Raises. For a national reference point, private-industry wages and salaries rose 3.1% over the 12 months ending September 2026, and benefit costs rose 3.9%, according to the Bureau of Labor Statistics Employment Cost Index. Your markets may run higher or lower.

  • Minimum-wage and scheduling-law changes in each location’s city and state, many of which take effect January 1.

  • Overtime, holiday premiums, shift differentials and predictability pay, based on what each location actually paid this year.

A location that ran well over its labor plan this year needs a closer look before it gets a bigger budget. Sometimes the plan was wrong. Sometimes the schedules were.


Step 3. Budget maintenance from the work orders

Maintenance spend comes in two kinds. Preventive maintenance is planned: filter changes, quarterly service visits, inspections. Reactive maintenance is everything that breaks without warning. Budget them as separate lines.

Preventive is predictable. Take this year’s schedule, adjust for equipment added or retired, and price it. A facility maintenance checklist is a good starting list for any location without one.

Reactive is where budgets get surprised. Use each location’s own reactive spend from this year as its baseline. A site with older equipment or heavier use will keep running higher, and its budget should say so up front.

While you’re in the work orders, look for repeat offenders, the units that generated four or five work orders this year. Each one either goes in next year’s repair line or moves to Step 4 as a replacement. If the backlog itself is the problem, here’s how to clear a maintenance backlog without burning out your team.


Step 4. Decide repair or replace before you set the capital line

Capital requests tend to arrive as a wish list, and the location that pushes hardest often gets the most. One rule makes the line fairer.

For each location, list the equipment that’s near or past its expected life, with what it’s worth today and what it cost to keep running this year. Then pick one repair-or-replace threshold and use it everywhere. For example, when a repair would cost half or more of what the asset is currently worth, price the replacement instead. The exact percentage matters less than applying the same one at every location.

Add open corrective actions that need money, too. When an audit turns up a problem that needs funding, like a failing walk-in cooler or a worn-out floor, give it an estimated cost. Mark it capital or operating so it gets a yes or a no in the budget instead of sitting open. Woven’s corrective action plan template has a field for that.


Step 5. Review each budget with the location’s manager

Last year’s numbers can’t see what’s coming. The general manager can: a competitor opening down the street, a lease renewal in June, a shift lead who plans to leave in March.

Give each manager 30 minutes with their location’s draft on screen, and ask:

  1. What’s changing at your location next year?

  2. What broke, or nearly broke, this year?

  3. What do you need that isn’t in here?

The review also builds ownership: a manager who helped set the number is more likely to run the location to it. Franchise Business Review’s 2026 Franchising at Work report, a survey of more than 9,500 franchise employees, found managers were the strongest part of the employee experience. That makes the GM the right person to carry the budget to the team.


Step 6. Turn the annual number into weekly and monthly targets

A budget that only gets opened again next December won’t change much in between. Break each location’s annual numbers into targets people can act on:

  • Labor becomes a weekly plan of hours and dollars that schedules are built against.

  • Maintenance gets a monthly spend review by location, with preventive and reactive side by side.

  • Capital becomes a dated list of what’s being replaced, when, and who owns it.

Then review variance every month, location by location. A location that runs over in March shows up in April, with nine months left to recover. Setting each location’s goals for the new year comes next.


How Woven helps you build the budget and stay on it

For locations that run on Woven, many of the numbers in this guide are already there.

This year’s actuals, by location. Report Center breaks this year’s numbers down by location, including Overtime by Location, Scheduled vs. Actual hours, time clock exports, Invoice Summary by Location, and work order reports by location, category and asset. Each location’s work order insights show maintenance spend by type and the preventive versus reactive mix, which is the split Step 3 needs.

Next year’s costs, before they arrive. Some of next year’s spending is already visible. Upcoming preventive maintenance comes straight from each location’s PM schedules and can be exported, and Average Invoice Cost by Vendor helps price it. The asset matrix shows each unit’s estimated end-of-life date and how much of its expected life is used, so the replacements coming due next year show up location by location. Warranties that recently lapsed or expire within 90 days are flagged, along with the repeat offenders. Corrective action plans from location audits carry an estimated cost, marked capital or operating, so findings that need money are already listed when you build the capital line.

Staying on plan once the year starts. Labor plans hold planned hours and, since November, planned dollars for each location, by day, position or department. As a manager builds the schedule, Woven shows scheduled hours and dollars against the plan, with the gap and the percent of plan. Dollars show only for people allowed to see pay. If a week goes over plan, Woven can ask the manager to confirm before publishing, or stop the publish unless someone with permission overrides it. Scheduled vs. Labor Plan reports cover the monthly review from Step 6.


Start next year with a budget every location can run to

Many budgets this December will start from last year’s file and a percentage. Building one location at a time takes longer the first year. In return, every number has a reason behind it, and every location has a manager who knows the plan because they helped write it.

If rebuilding every location at once is too much, start with the two or three that surprised you most this year. That’s usually where a flat percentage was furthest off.

One more line is worth a place in next year’s plan: getting these numbers out of separate systems and into one.

Deciding what makes next year’s budget? See whether Woven belongs in it. Book a demo and we’ll walk through this year’s numbers and next year’s plan with your locations.


Frequently asked questions

What is a location-level budget?

A location-level budget is a separate budget for each location’s labor, maintenance, capital and operating costs, built from that location’s own actual spending and then rolled up into the company budget.

What should each location’s budget include?

Labor by position, overtime and premium pay, preventive and reactive maintenance, capital replacements, corrective actions that need funding, and other operating costs such as utilities, supplies and service contracts.

What’s the difference between top-down and bottom-up budgeting?

Top-down budgeting starts with a company-wide number, often last year’s total plus a percentage, and divides it among locations. Bottom-up budgeting starts at each location, builds its budget from its own actual costs and known changes, and adds the locations up to get the company total. For a multi-location business, bottom-up budgeting picks up differences in wages, equipment age and traffic that a single percentage misses.

How do you build a budget for multiple locations?

Build each location’s budget first, from its own actual spending, then add them up. Remove one-time costs, plan labor in hours before dollars, set maintenance from work order history, and review each draft with the location’s manager.

How much should we plan for wage increases next year?

Start from each location’s current pay rates and local minimum-wage changes. Nationally, private-industry wages and salaries rose 3.1% in the 12 months ending September 2026 (BLS Employment Cost Index), but markets and roles vary, so set the figure by location.

How often should location budgets be reviewed?

Monthly, by location. Labor is worth checking weekly against the schedule, while a manager can still change it.

One platform driving consistency, accountability & productivity for multi-location success.

Woven | 11350 N Meridian St # 400, Carmel, IN 46032

Copyright © 2025 Woven. All Rights Reserved

One platform driving consistency, accountability & productivity for multi-location success.

Woven | 11350 N Meridian St # 400, Carmel, IN 46032

Copyright © 2025 Woven. All Rights Reserved

One platform driving consistency, accountability & productivity for multi-location success.

Woven | 11350 N Meridian St # 400, Carmel, IN 46032

Copyright © 2025 Woven. All Rights Reserved